摘要 |
<P>PROBLEM TO BE SOLVED: To solve the problem of increasing time and cost associated with completion of a circuit and/or rearrangement of a cable 24, in a cable bridge for a wind power turbine tower. <P>SOLUTION: This wind power turbine 2 includes a tower 4 having at least one joining part 20, at least one cable 24 extending by crossing at least the one joining part 20, and the cable bridge 50 for supporting at least the one cable 24 by going over at least the one joining part 20. <P>COPYRIGHT: (C)2010,JPO&INPIT |