发明名称 System and method to optimize OS scheduling decisions for power savings based on temporal charcteristics of the scheduled entity and system workload
摘要 <p>In some embodiments, the invention involves a system and method to enhance an operating system's ability to schedule ready threads, specifically to select a logical processor on which to run the ready thread, based on platform policy. Platform policy may be performance-centric, power-centric, or a balance of the two. Embodiments of the present invention use temporal characteristics of the system utilization, or workload, and/or temporal characteristics of the ready thread in choosing a logical processor. Other embodiments are described and claimed.</p>
申请公布号 EP2012233(A2) 申请公布日期 2009.01.07
申请号 EP20080251192 申请日期 2008.03.28
申请人 INTEL CORPORATION 发明人 FENGER, RUSSELL J.;PUTHIYEDATH, LEENA K.
分类号 G06F9/46;G06F9/48 主分类号 G06F9/46
代理机构 代理人
主权项
地址