摘要 |
PROBLEM TO BE SOLVED: To provide a simple construction method for a base-isolated foundation structure.SOLUTION: A construction method for a base-isolated foundation structure includes the following steps performed in sequence of: laying out an anchor bolt positioning jig on leveling concrete; temporarily fixing a temporary anchor bolt on the anchor bolt positioning jig; arranging a reinforcing bar for forming a foundation of a structure; removing the temporarily fixed temporary anchor bolt; installing a lower plate with the anchor bolt in a space where the temporary anchor bolt was located, such that the anchor bolt may be inserted; and casting concrete of the foundation.SELECTED DRAWING: Figure 9 |