发明名称 REAL-TIME SWITCHING METHOD ON A RESERVE POWER SUPPLY CONDITION FOR AN AUTO-SWITCHING APPARATUS BASED ON A REAL-TIME POWER FLOW
摘要 PURPOSE: A real-time switching method of a real-time power flow based automatic switching device is provided to control a load by supplying the reserve power in an outage of a power supply device. CONSTITUTION: A real-time use power of an overall load is summed(S10). The sum of the real-time use power of the overall load is compared with the reserve power contract capacity(S14). If the sum of the real-time use power of the overall load is larger than the reserve power contract capacity, the reserve power contract capacity is compared with the valve obtained by subtracting the real-time use power of the load with the lowest priority from the sum of the real-time use power of the overall load(S16). If the valve obtained by subtracting the real-time use power of the load with the lowest priority from the sum of the real-time use power of the overall load is larger than the reserve power contract capacity, a first trip command is provided to the circuit breaker of the load(S20).
申请公布号 KR100941401(B1) 申请公布日期 2010.02.10
申请号 KR20090092922 申请日期 2009.09.30
申请人 OH, YOUNG KWON;TOP INDUSTRIES CO., LTD.;TOP INFORMATION CO., LTD. 发明人 OH, YOUNG KWON
分类号 H02J9/06 主分类号 H02J9/06
代理机构 代理人
主权项
地址