发明名称 |
CONTROLLED PLACEMENT OF PROPPANT WHILE FRACTURING |
摘要 |
The present invention includes a method for providing fractures (105) from a wellbore in a formation (122), the method including the steps of: providing a wellbore into the formation; providing at least one controllable sleeve valve (104) incorporated into a casing (102) within the wellbore; providing a sensor (114) to determine a flow rate of fluids passing through the controllable sleeve valve; injecting into the wellbore a fluid at a pressure sufficient to initiate and propagate a fracture in the formation juxtaposed to the sleeve valve; including a proppant material in the fluid; determining, in real time, the amount of proppant that has entered the fracture juxtaposed to the sleeve valve; and closing the sleeve valve when a predetermined amount of proppant has entered the fracture. |
申请公布号 |
WO2016200808(A1) |
申请公布日期 |
2016.12.15 |
申请号 |
WO2016US36211 |
申请日期 |
2016.06.07 |
申请人 |
SHELL OIL COMPANY;SHELL INTERNATIONALE RESEARCH MAATSCHAPPIJ B.V. |
发明人 |
LANGILLE, David Lindsay Alexander;MOLENAAR, Menno Mathieu |
分类号 |
E21B34/06;E21B34/00;E21B43/14;E21B43/267;E21B47/10 |
主分类号 |
E21B34/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|