摘要 |
Ganged form for the underground wall and the construction method of underground wall using the same are provided that the work efficiency is increased and the construction period is shortened since the concrete the ganged form is salvaged in the ganged form after filling and curing without the ganged form dismantlement with crane. A construction method of the underground wall using the ganged form(10) for underground wall comprises following steps: a step of side by side setting up the horizontal backing timber according to the dimension of the thickness of the wall(103) in the floor(102) of the basement floor; a step of disposing in the home position of the horizontal backing timber the ganged form manufactured through crane in advance; a step of setting up the tie rod(110) which crosses the ganged form facing to the constant interval; a step of carrying out the construction the wall it cures the concrete within the ganged form; a step of salvaging to crane the ganged form which is assembled in the wall after removing both ends of the tie rod. |