发明名称 METHODE OF GROUND DRILLING FOR PIER FOUNDATION
摘要 A ground excavation method for bridge foundation work is provided to manage equipment for ground excavation effectively and to shorten construction progress accordingly, and to improve the accuracy of bridge foundation work by exact vertical excavation. A ground excavation method for bridge foundation work comprises the steps of: installing a water or earth retaining cell on the ground(S10); fixing at least one or more insertion locations of casing tubes to the inside of the cell(S20); putting a casing tube and a boring machine to the inside of the cell and inserting the casing tube to the ground(S30); removing the earth and bedrock contained in the casing tube to the outside of the cell using a grab(S40); pulling out the casing tube inserted to the ground using a drawing machine(S50); crushing an earth layer and a bedrock layer using a chisel(S60); and removing the crushed bedrock and earth(S70).
申请公布号 KR100846874(B1) 申请公布日期 2008.07.16
申请号 KR20070045779 申请日期 2007.05.11
申请人 EUNSUNG CONSTRUCTION CO., LTD. 发明人 EUN, HEE SUNG
分类号 E01D19/02 主分类号 E01D19/02
代理机构 代理人
主权项
地址