<p>The cooling gas located in the generator (1) of a power station for cooling the generator (1) during its operation under load is displaced by a gaseous stored inert gas, in particular argon. This makes the generator inertizing process easier, faster and less energy consuming, dispensing with a time-consuming and energy-intensive phase conversion process of a for example liquid inert gas into a gaseous inert gas. The inert gas reserve can be easily monitored by pressure measurement (34).</p> |