发明名称 LOAD CONTROL SYSTEM
摘要 <p>PROBLEM TO BE SOLVED: To provide a load control system in which control can be attained in the priority order corresponding to the real time request level of an operation even for a request for the transmission of a control signal from plural operating terminals to a load control means corresponding to plural different operating functions. SOLUTION: This load control system is provided with a central processing unit 2 connected with the transfer relation of a time-division transmission signal including an address signal to a signal transmission line 1, plural operating terminal 3, and a load control means 4 to be operated through the central processing unit by the plural operating terminals. Moreover, the operating material 3 is provided with an operating part having plural operating functions, and an address is applied to each operating function. One or both of the central processing unit 2 and the operating terminal 3 are provided with a priority order judging means 2d for judging the priority order according to the address. When the load control means 4 is a light dimmer controller, the operating part of the operating terminal is provided with a master fader, a scene changeover switch a preset fader, and a load selection switch, and the priority order is judged in this order for each operating function.</p>
申请公布号 JPH11282501(A) 申请公布日期 1999.10.15
申请号 JP19980084474 申请日期 1998.03.30
申请人 TOSHIBA LIGHTING & TECHNOLOGY CORP 发明人 SASAI TOSHIHIKO
分类号 G05B7/02;H05B37/02;(IPC1-7):G05B7/02 主分类号 G05B7/02
代理机构 代理人
主权项
地址