发明名称 SERVICE LIFE PREDICTION METHOD FOR POWER GENERATION PLANT PIPING
摘要 <p>PROBLEM TO BE SOLVED: To provide a highly accurate piping wall thickness reduction prediction method. SOLUTION: A time for reaching a minimum allowably wall thickness is accurately estimated, by showing a wall thickness reduction amount as a nonlinear function of time in relation to a remaining service life by the aid of a statistical analysis from data base of wall thickness reduction rate computed from the past measured wall thickness measurment result, or by inputting a correction item of parameter corelation effect in a prediction formula. Accordingly, the piping inspection time is determined properly and saving of inspection is ensured, and owing to the high accuracy of prediction method, a large contribution is made to the safe operation of a plant.</p>
申请公布号 JP2001280599(A) 申请公布日期 2001.10.10
申请号 JP20000101191 申请日期 2000.03.31
申请人 HITACHI LTD 发明人 HIRA YASUO;AOIKE SATOSHI;OHASHI TAKEYA;HISATSUNE SHINICHI
分类号 F17D5/02;G01N17/00;G05B23/02;G06F19/00;G06Q10/04;(IPC1-7):F17D5/02 主分类号 F17D5/02
代理机构 代理人
主权项
地址