发明名称 CONSTRUCTION METHOD OF SECTIONAL VERTICAL TUNNEL AND PRECAST STRUCTURE USED IN METHOD
摘要 PURPOSE: A construction method of a sectional vertical tunnel and a precast structure used in the method are provided to reduce a period and a cost of construction of the vertical member, and to prevent the generation of accidents by improving working conditions. CONSTITUTION: The construction method of a sectional vertical tunnel comprises a temporary structure dismantling step(10); a first segment assembly step(20) for forming a cylindrical body by assembling trapezoid segments in a zigzag pattern; a second segment assembly step(30) for laminating another segment assembly onto the cylindrical body; a slab assembly step(40) for installing a plurality of brackets at regular distances inside the segments and assembling a slab over the brackets; a stairs assembly step(50) for forming stairs in a space defined at the center of the slab for facilitating the access of workers; and a finishing step(60) for the back filling of the segments, and these steps as stated above are repeated until that the vertical tunnel reaches to the ground.
申请公布号 KR20020073985(A) 申请公布日期 2002.09.28
申请号 KR20010014023 申请日期 2001.03.19
申请人 KT CORPORATION 发明人 LEE, CHANG HO
分类号 E21D5/00;(IPC1-7):E21D5/00 主分类号 E21D5/00
代理机构 代理人
主权项
地址