发明名称 METHOD OF TAKING MEASURE FOR SAFETY AGAINST UNDERGROUND PIPE
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a method by which stressed state of an underground pipe can be confirmed and, when the pipe is damaged, measures can be taken quickly at the time of executing construction work in an area of the pipe. <P>SOLUTION: An infrastructural engineering 1 belonging to a technical department of a corporation laying the underground pipe as an infrastructure, an infrastructural site 2 who witnesses the construction work at the job site as a representative of the corporation, the executing company 3 of the construction work, and a client 4 of the construction work become participants who make prior consultations, etc., through the Internet 10. A stress analysis server 11 calculates the stressed state of the pipe by means of an FEM, etc., based on the data about a displaced ground at the job site and the distributions of stresses and strains generated in the infrastructure are used as shared information among the participants. When the stressed state of the pipe reaches a warning level, measures are taken and the effect of the measures is monitored and approved on the Internet 10. <P>COPYRIGHT: (C)2004,JPO</p>
申请公布号 JP2003279389(A) 申请公布日期 2003.10.02
申请号 JP20020087083 申请日期 2002.03.26
申请人 OSAKA GAS CO LTD 发明人 FUJITA YUSUKE;OGAWA YASUO
分类号 G01L1/00;F16L1/024;G01D21/00;G08C15/00;(IPC1-7):G01D21/00 主分类号 G01L1/00
代理机构 代理人
主权项
地址