发明名称 |
Method for making platform spanning trench comprises placing prefabricated concrete girders on supports, girders having intermediate portion and end portions of lesser height, concrete poured over girders to form slabs |
摘要 |
The method comprises placing prefabricated concrete girders (1) on support legs (11). The girders have end portions (2a,2b) extending either side an intermediate portion (2c) of predetermined height. At least the first end portion has a height less than that of the intermediate portion. The beams are placed side by side. Concrete is poured over the girders to form a slab (13) so that it has, in line with the intermediate portion, a raised part (13.2) relative to a part of the slab (13.1) extending in line with first end portion. The part of the slab extending in line with the first end portion is covered with earth (14).
|
申请公布号 |
FR2843977(A1) |
申请公布日期 |
2004.03.05 |
申请号 |
FR20020010676 |
申请日期 |
2002.08.28 |
申请人 |
CONSEIL SERVICE INVESTISSEMENTS;BRUGEAUD YVES |
发明人 |
BRUGEAUD YVES |
分类号 |
E02D29/05;(IPC1-7):E01D2/00 |
主分类号 |
E02D29/05 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|