发明名称 Concrete structure made from prefabricated components - uses site cast elements made in shuttering formed of units movable on tower crane track
摘要 <p>The building system uses reusable formwork, and standard prefabrication and installation systems can be designed for use on the building site. All construction components are cast as prefabricated elements on the building site in a steel shuttering arrangement built up from units. The shuttering units have support wheels with such a track width that they can be moved on the track of a tower crane. The prefabricated concrete elements are lifted after hardening by the tower crane, and are moved to the building.</p>
申请公布号 DE2707576(A1) 申请公布日期 1978.08.24
申请号 DE19772707576 申请日期 1977.02.22
申请人 MAGURA,KARLHEINZ,DIPL.-ING.;WALTENBAUER,KLAUS,DIPL.-ING.;WEISS,GREGOR,DIPL.-ING. 发明人 MAGURA,KARLHEINZ,DIPL.-ING.;WALTENBAUER,KLAUS,DIPL.-ING.;WEISS,GREGOR,DIPL.-ING.
分类号 B28B7/08;B28B15/00;(IPC1-7):28B15/00;28B7/22;28B7/02;28B7/24;28B7/00;04G21/00 主分类号 B28B7/08
代理机构 代理人
主权项
地址