发明名称 VERFAHREN ZUM TROCKENEN TUNNELVORTRIEB BEI DER ROHRVORPRESSUNG
摘要 A shield (3) bearing against the heading face is advanced hydraulically via a trailing tube (4), new concrete tubes (5) being continuously pushed along. The material is transferred from an excavating unit (8) to a conveyor belt (18) and from the latter to a haulage truck (21), the conveyor belt (18) being operated at two different speeds. While the haulage truck (21) is being unloaded outside the tunnel, the conveyor belt (18) runs at the lower speed and is loaded over its entire length with material, which is emptied at the higher belt speed after the empty haulage truck (21) has arrived. The interplay of excavating unit, conveyor belt and haulage equipment permits continuous driving. <IMAGE>
申请公布号 DE2840280(A1) 申请公布日期 1979.07.05
申请号 DE19782840280 申请日期 1978.09.15
申请人 INGENIEURBUERO MARTIN HERRENKNECHT 发明人 HERRENKNECHT,MARTIN
分类号 E21D9/00;E21D9/12;(IPC1-7):E21D9/06 主分类号 E21D9/00
代理机构 代理人
主权项
地址