摘要 |
<p>A method for processing monitored data from a remote asset (5) to optimize maintenance and operation schedules, the method comprising the steps of collecting data from the remote asset, building a data set based on the data collected (20, 22, 24, 26), applying statistical scripts to the data set to create a statistical model (28, 30, 32, 34, 36), comparing the statistical model to the data set, (40, 42, 44, 46), creating a standardization model from the compared statistical model and the data set (48, 50), applying a trending algorithm to the data (52), deriving statistical based control limits, (54, 56, 58) and applying the control limits to a new set of collected data (60, 62).</p> |