发明名称 COFFERING GROUTING METHOD OF BRIDGE WELL FOUNDATION
摘要 PURPOSE: A coffering grouting method of a bridge well foundation is provided to secure a certain quality of concrete and to enable a safe construction about a pier. CONSTITUTION: A bridge well foundation(50) is formed with a plurality of upper and lower grouting holes on a steel shoe(52), into which a grouting pipe(62) being inserted respectively. The grouting pipe located near the steel shoe is fastened with a bolt and also a waterproof rubber ring is inserted into the grouting pipe. After loading a grouting device(80) and a mixer(78) on a barge(76) adjacent to the well foundation, a grouting nozzle pipe(82) coupled with the grouting device is connected to the upper and lower grouting holes, and then water inside the well foundation is discharged through a pipe(86) by using an underwater pump(84). Finally, a placing work of dry concrete within the well foundation is performed.
申请公布号 KR20020089694(A) 申请公布日期 2002.11.30
申请号 KR20010028323 申请日期 2001.05.23
申请人 YOO SHIN ENGINEERING CO., LTD. 发明人 RYU, YEON TAEK
分类号 E02D15/06;(IPC1-7):E02D15/06 主分类号 E02D15/06
代理机构 代理人
主权项
地址