摘要 |
PROBLEM TO BE SOLVED: To provide a foundation pile capable of realizing excellent base isolation force and economical and efficient design execution by reducing excessive design in a design taking earthquake case into consideration. SOLUTION: A hollow elastic body 30 taking a reaction force from a structure 7 supported by a ground 20 in which foundation piles 10 are driven or constructed or the foundation pile 10 is provided at the pile head 11. A fluid 50 is put with pressure in the hollow space 31 of the hollow elastic body 30 to load the foundation piles 10. The liquid 50 is left in the hollow space 31 after the pile has been loaded with the liquid. COPYRIGHT: (C)2003,JPO |