摘要 |
<P>PROBLEM TO BE SOLVED: To provide a generator operation control method which can reduce errors in a constant operation of receiving electric power, and allows generators to be operated as much as possible in an effective region. <P>SOLUTION: In the generator operation control method for a power generation system for systematically linking a power receiving system to a plurality of power generators, only one scheduled stop generator performs a constant control of receiving electric power, and the other remaining power generators in operation performs a constant operation at a rated output, allowing the number of insensitive bodies as a whole to be confined to one power generator to effectively operate the power generators. <P>COPYRIGHT: (C)2006,JPO&NCIPI |