摘要 |
The system for Acrylonitrile Butadiene Stylene (ABS) plant comprises an ABS process control computer (30), a polystylene (PS) process control computer (20), a plant management computer (10) managing the plant with data from the computers (20,30). The data generated at each site is corrected by the computers (20,30) and transmitted to the computer (10) and stored at its data base. On the base of the data base contents, each function menu for optimal production simulation of the extruder located at each site and management menus for the ABS and PS site are operated.
|