The prefabricated building (1) is made up of two mirror-image halves which contain ready-installed switching equipment. The prefabricated sections can be erected and assembled at the installation site. The switching equipment provided in the building requires only a few central connection units for linking up with connection points outside the building. Once the electrical connections have been made the building becomes completely operational.
申请公布号
DE4412308(A1)
申请公布日期
1995.10.12
申请号
DE19944412308
申请日期
1994.04.09
申请人
LEONHARD WEISS GMBH & CO NIEDERLASSUNG CRAILSHEIM, 74564 CRAILSHEIM, DE
发明人
KOBER, HANS, 74564 CRAILSHEIM, DE;JAKOB, WOLFGANG, DR.-ING., 71642 LUDWIGSBURG, DE;WEININGER, DIETER, 74343 SACHSENHEIM, DE