摘要 |
The header (5) has header main structure that is located above a connecting device for supporting top resting load. The inner pipe portion is inserted into pipe portion (3) of building support (1) and extended along downward direction. An attachment portion (6) is provided to attach header main portion with inner pipe portion of support. The clamping portion (53) is provided for pre-tensioning the building support attached with header main portion by attachment unit. Independent claims are included for the following: (1) kit for header; and (2) method for connecting header. |