发明名称 STEEL PIPE COLUMN ARRAY EARTH RETAINING WALL AND ITS WATER PASSING METHOD
摘要 PROBLEM TO BE SOLVED: To contrive the facility of restoration of underground water and a method for water passing after construction completion by preparing earth retaining blocks at prescribed intervals, forming a connection sheet pile having a joint material provided on a side end, and mutually connecting the earth retaining blocks. SOLUTION: In the construction of an underground structure, an earth retaining wall A is embedded in a support layer or an impervious layer on the ground of both sides sandwiching construction ground to be prepared, fixed on the ground, and after the building frame of the structure is constructed, soil and sand is back-filled. A water passing layer such as gravel and crushed stones is provided at a part of height corresponding to underground water, vibration is applied to a connection sheet pile 8 to cut a joint material of connection with the ground and the connection sheet pile 8 is pulled. A water passing part connecting the rear face ground of the earth retaining wall A and the ground of a construction side is formed between earth retaining blocks 1, 1, and the pulled connection sheet pile 8 is repeatedly used for next execution. Thereby the water passing part communicating with underground water is provided, and the earth retaining wall A functioning as the earth retaining wall and an impervious wall during construction can be made a water passing wall restoring underground water after construction completion.
申请公布号 JP2000220137(A) 申请公布日期 2000.08.08
申请号 JP19990024161 申请日期 1999.02.01
申请人 KUBOTA CORP 发明人 HAMAMOTO SHINNOSUKE;IKENOBU HIDEAKI;ISHII KOICHIRO;SUGIHARA HIROHIDE;NOBORI KENJI
分类号 E02D5/20;(IPC1-7):E02D5/20 主分类号 E02D5/20
代理机构 代理人
主权项
地址