发明名称 RAILROAD BALLAST REPLACEMENT SYSTEM AND BALLAST REPLACEMENT METHOD
摘要 PROBLEM TO BE SOLVED: To obtain a railroad ballast replacement system which can efficiently and positively execute replacement work and can shorten working hours, while reducing the man-hour and the number of vehicles required for the ballast replacement works. SOLUTION: The ballast replacement system is comprised of a series of working trains 51 including hopper vehicles 53a to 53e in which is loaded with new ballast NB, and a ballast working vehicle 52 is equipped with a ballast scraper 56. The ballast working vehicle has discharging conveyors 57a, 57b for conveying scraped ballast B to the tail end hopper vehicle, and a charging conveyor 58 for charging the new ballast to an excavated area where the ballast has been scraped off. Each hopper vehicle has a first belt conveyor 61 for continuously conveying the ballast which has been transferred from the discharging conveyor, from the tail end carrying vehicle to the front end carrying vehicle, and second and third belt conveyor 62, 63 for conveying the new ballast to the charging conveyor.
申请公布号 JP2001081705(A) 申请公布日期 2001.03.27
申请号 JP19990259033 申请日期 1999.09.13
申请人 MITSUBISHI HEAVY IND LTD;CENTRAL JAPAN RAILWAY CO;NIPPON SHARYO SEIZO KAISHA LTD;NIPPON KIKAI HOSEN KK;MIZUTANIGUMI:KK 发明人 TANAKA MASAYUKI;MIYAMOTO TAKASHI;ABE KINICHI;ODA HIDEKATSU;MIYAJI HARUKI;TAMAI AKIRA;KATO YOSHINORI;OSHIMA SATOYUKI
分类号 E01B27/10;(IPC1-7):E01B27/10 主分类号 E01B27/10
代理机构 代理人
主权项
地址