摘要 |
<p><P>PROBLEM TO BE SOLVED: To facilitate temperature control by reducing the temperature drop of exhaust gas, to reduce pressure loss to reduce the load of an induction fan and to reduce an installation area. <P>SOLUTION: A gas cooler 2, an air preheater 3, an exhaust gas cleaning apparatus 4, the induction fan 7 and a flue 8 are arranged to the exhaust gas treatment system of waste treatment equipment. A dust collector 5 is provided to the exhaust gas cleaning apparatus 4 on the upstream side in one casing 9 and an activated carbon adsorbing device 6 is provided thereto on the downstream side so as to be connected to the dust collector 5. <P>COPYRIGHT: (C)2004,JPO</p> |