摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a reclamation method capable of increasing soil bearing capacity of the completed landfill site than before and enlarging uses of the completed landfill site. <P>SOLUTION: The existing reclamation method is improved. For the outline, when a reclamation objective substance is thrown in a scheduled reclamation place to fill up, a solid material having 0.5 to 20.0 mass outer % and moisture having 5 to 40 mass % are added to the reclamation objective substance to mix, and the mixed substance is thrown in the scheduled reclamation place. In that case, the reclamation objective substance is demolition waste generated by demolition work of a building, construction work of a road and a tunnel and the excavation of the ground, a cracked object of asphalt and excavated surplus soil, and it is favorable that the scheduled reclamation place is selected from a water surface and sea surface such as a river, a lake, a swamp and a seashore or the like, mountains on the ground, a recessed ground and back filling places of the building. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p> |