摘要 |
<p>PURPOSE:To execute leveling of power consumption, and to improve the mobility of a system by lowering in advance the sensitivity of a sensor of the system, when starting and turning on a load whose influence exerted on a power source is large, of a chiller, etc., and setting a priority degree of an operation. CONSTITUTION:An output voltage of a power generator 11 is supplied in parallel to an information processing system 12 consisting of a power source controller 121, a main operation controller 122 and a peripheral equipment 123, and a chiller 13 consisting of a power source controller 131 and a chiller body 132. Temperature sensors 14, 15 are connected to this main operation controller 122 and the power source controller 131, respectively. In this regard, the power source control part 131 gives a request of turn-on and re-turn-on of the chiller 13 to the main operation controller 122 by an output of the temperature sensor 15, and executes an operation control of the chiller 13. In such a case, by lowering in advance the sensitivity for detecting an instantaneous disconnection, an influence exerted on the processing system 12 of the time when starting the chiller 13 is suppressed. Also, when requesting an operation of the chiller 13, each task of the system 12 and a priority operation of the chillr 13 are determined in advance, and by deciding it, the operation is executed preferentially.</p> |