发明名称 CABLE POWER TRANSMISSION AND DISTRIBUTION SYSTEM
摘要 PURPOSE:To secure redundancy of power transmission and distribution with an inexpensive cost by a method wherein cables in normal service for respective phases and at least a preliminary cable for one phase are provided and when trouble is caused in either one phase among the working cables, the preliminary cable is employed instead of said cable in trouble. CONSTITUTION:Faulty phase discriminating relays 3 are installed at both ends of a cable. When trouble is caused in a first phase, for example, the relay contacts of first phases of the faulty phase discriminating relays 3, 3 are closed. The normal-preliminary switching of switching devices 1 at both ends of the cable is effected after confirming the trouble in the phase by the faulty phase discriminating relays 3, 3 at both ends of the cable. For your reference, the faulty phase discriminating relays are provided at both ends of a section, in which both of the normal and preliminary cables are laid, however, the relays may be installed at only the end of the power source side of the cables.
申请公布号 JPH03112315(A) 申请公布日期 1991.05.13
申请号 JP19890247321 申请日期 1989.09.22
申请人 HITACHI LTD 发明人 OGA EIGO;SATAKE SADAMITSU
分类号 H02H3/02;H02G1/00;H02H3/34 主分类号 H02H3/02
代理机构 代理人
主权项
地址