Pre-stressed bridge tendons for stress transmission
摘要
The tendons (7) traverse the cantilevers in an arc and are free of concrete on one section edge between the cantilevers and are screened off here by a parting layer (8) for removal from the concrete. The tendons can be inspected etc. from the side furthest from the concrete and adjoin the concrete flat on or along one side. The parting layer comes in U-shape open at the side furthest from the concrete or opened here and the layer (8) provides a larger clear section than the tendons require.