发明名称 NATURAL GROUND CONSOLIDATING METHOD AND TUNNEL EXCAVATING METHOD
摘要 PROBLEM TO BE SOLVED: To provide an injection method which can continuously perform injection work, and can uniformly carry out natural ground consolidation in a short period of time. SOLUTION: An injection pipe 4 is produced by attaching a cap 6 to one end thereof, forming injection holes 5B, 5B' in the pipe in a longitudinal direction, and forming bag bodies 7 on the pipe so as to cover the injection holes 5B. Then, an external pipe 3 having an injection hole 5A formed therein is produced. Further, the external pipe 3 is inserted into a long hole bored in the natural ground 1, and then the injection pipe 4 is inserted into the external pipe 3. Grout is squeeze-pumped into the injection pipe 4, to thereby improve the natural ground 1.
申请公布号 JP2001200530(A) 申请公布日期 2001.07.27
申请号 JP20000341369 申请日期 2000.11.09
申请人 DENKI KAGAKU KOGYO KK 发明人 ARIMIZU EIICHI;MIBE TAKASHI;ISHIDA HIDEO
分类号 E02D3/12;E21D9/04;(IPC1-7):E02D3/12 主分类号 E02D3/12
代理机构 代理人
主权项
地址