发明名称 IMMERSION CONSTRUCTION METHOD OF SHAFT
摘要 PROBLEM TO BE SOLVED: To provide an immersion construction method for reducing a construction cost, having a high construction speed, having a simple coupling structure of blocks, making the minimum necessary thickness of a pipe thickness capable of enduring soil pressure and facilitating position control of a sewer pipe connection opening without leaving a steel casing. SOLUTION: In the immersion construction method of a shaft, the steel casing 2 is inserted in the insides of a plurality of connected concrete-made shaft construction blocks 1, a cutting edge 3 whose outside diameter is larger than that of the shaft construction block 1 is mounted on the lower end, the upper part of the steel casing 2 is set on a shaft excavation rotation press-in machine 4 through a cap 6, dug to be pushed into underground while rotation press-in force is applied, and after the shaft construction block 1 is put down to a prescribed position, the steel casing 2 is pulled.
申请公布号 JP2003155887(A) 申请公布日期 2003.05.30
申请号 JP20010353769 申请日期 2001.11.19
申请人 CHICHIBU CONCRETE KOGYO KK 发明人 ONDA MINORU;MATSUMURA TAKEFUMI
分类号 E21D1/08;(IPC1-7):E21D1/08 主分类号 E21D1/08
代理机构 代理人
主权项
地址