发明名称 METHOD AND SYSTEM FOR CALCULATING PERIOD OF CONSTRUCTION WORK
摘要 <p><P>PROBLEM TO BE SOLVED: To easily determine the period of construction work for a building from the architectural area of the building to be constructed, relating to a method for calculating the period of construction work of, e.g., a building. <P>SOLUTION: For a building to be constructed, its application, the kind of the building structure, information on whether or not the building has basements, and its architectural area to be constructed are inputted from an input device 12. A central processing unit 13 extracts and reads from a storage device 17 regression equations corresponding to a variety of data on the application, the kind of the building structure and information on whether the building has basements, and factors related to the regression equations. The central processing unit calculates the period of construction work on the basis of the read regression equations, the factors and the architectural area. <P>COPYRIGHT: (C)2004,JPO</p>
申请公布号 JP2004100205(A) 申请公布日期 2004.04.02
申请号 JP20020261458 申请日期 2002.09.06
申请人 TODA CONSTR CO LTD;ISHIMARU RINTARO;SUENAGA YASUMI 发明人 KATO TATSUHIKO;ISHIMARU RINTARO;SUENAGA YASUMI
分类号 E04G21/00;G06Q50/00;G06Q50/08;(IPC1-7):E04G21/00;G06F17/60 主分类号 E04G21/00
代理机构 代理人
主权项
地址