发明名称 System and method for providing information to operator of pile driver
摘要 A system and method for precisely controlling an amount of tilt of a plumb pile or a batter pile without using two surveying instruments or a clinometer. The system for providing operational information to an operator of a pile driver 10 for driving a pile 101 into the ground has first means 14 for obtaining first data of tilt of the pile in a first coordinate system, a second means 16 for converting the first data into a second data in a second coordinate system defined by at least two points Pl, Pr, and display means 17 for displaying the amount of tile in the second coordinate system.
申请公布号 US9499952(B2) 申请公布日期 2016.11.22
申请号 US201314414524 申请日期 2013.07.12
申请人 KANSAI KOUJI SOKURYOU CO., LTD.;NIPPON STEEL & SUMITOMO METAL CORPORATION 发明人 Nakaniwa Kazuhide;Abe Yukio
分类号 G06F7/70;E02D11/00;E02D13/06 主分类号 G06F7/70
代理机构 Buchanan Ingersoll & Rooney PC 代理人 Buchanan Ingersoll & Rooney PC
主权项 1. A method for providing operational information to an operator of a pile driver for driving a pile into the ground, the method comprising the steps of: (a) setting a total station; (b) determining a mechanical coordinate of the total station; (c) defining a first coordinate system, the first coordinate system having a coordinate origin thereof at the mechanical coordinate; (d) causing the total station to collimate a first central point on a surface of the pile and determine a first coordinate of the first central point in the first coordinate system; (e) causing the total station to collimate a second central point on the surface of the pile and determine a second coordinate of the second central point in the first coordinate system; (f) setting first and second targets on the pile driver or respective positions away from the pile driver; (g) causing the total station to determine coordinates of the first and second targets in the first coordinate system; (h) defining a second coordinate system, the second coordinate system having a first horizontal direction parallel to the a vertical plane including the coordinates of the first and second targets, a second horizontal direction orthogonal to the first horizontal direction, and a reference point at which the pile is to be driven into the ground; (i) converting a first coordinate data in the first coordinate system into the second coordinate system to determine a second coordinate data in the second coordinate system, the first coordinate data being coordinates of first and second centers defined from the first and second coordinates; and (j) determining an amount of tilt of the pile in the second coordinate system using the second coordinate data.
地址 Minoo-Shi, Osaka JP