发明名称 LOAD TRANSFER METHOD AND SYSTEM FOR TRANSFORMER SUBSTATION BUS
摘要 A load transfer method and system for a transformer substation bus. The method comprises: acquiring a load transfer compiling plan of a power distribution network line, wherein the load transfer compiling plan comprises a loop closing plan and a loop opening plan (101); determining whether the load transfer compiling plan meets a first preset condition (102); when the transformer substation bus requires transferring and the load transfer compiling plan meets the first preset condition, executing the loop closing plan, thus performing a loop closing operation on a line of a corresponding loop closing region; and after the loop closing plan is successfully executed, executing the loop opening plan, thus performing a loop opening operation on a line of a corresponding loop opening region (103). Compared with methods for realizing load transfer of a transformer substation bus point by point and line by line in the prior art, the load transfer method and system for a transformer substation bus not only shorten the load transfer time, but also reduce the workload of a scheduler.
申请公布号 WO2016169240(A1) 申请公布日期 2016.10.27
申请号 WO2015CN92834 申请日期 2015.10.26
申请人 HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER COMPANY;STATE GRID CORPORATION OF CHINA (SGCC);STATE GRID ZHEJIANG ELECTRIC POWER COMPANY 发明人 ZHENG, Weiyan;QUE, Bo;ZHONG, Hui;ZHU, Yiyong;CHEN, Lei;SU, Yifang;HUANG, Wuhao;LIU, Jiaqi;WANG, Kai;ZHAO, Zheng;YUAN, Zhe
分类号 H02J3/00 主分类号 H02J3/00
代理机构 代理人
主权项
地址