摘要 |
The concrete distribution system includes a pump vehicle (1) and a bulk concrete transportation tank vehicle (10), both of which are equipped with rotatable tanks. In the pump vehicle (1) the pump (4) is located between the cab (2) and the tank (3) and the discharge opening (6) is arranged to pour the concrete mass into the feed funnel (7) of the pump (4). The pump vehicle (1) includes devices to prevent the overfilling of the feed funnel (7) of the pump, in which case the pump (4) does not require continual supervision. |