摘要 |
PROBLEM TO BE SOLVED: To cure a gap safely and easily which is created between scaffolds or between a scaffold and exterior wall of building temporarily erected on the construction site. SOLUTION: A pair of pipe members 3 and 4 are attached to edge portions 2A and 2B facing in parallel of a fiber reinforcing sheet 2 of wire meshes into which worker's foot does not enter, a pair of pipe members 3 and 4 are crossed in a freely adjusting manner for the intervals to existing scaffold frames by books 31, 32, 41, 42 provided at both the ends of the pipe members 3 and 4, in this way, curing of the gap G can be achieved.
|