发明名称 METHOD FOR SPEEDING UP OPERATION OF GAS TURBINE PLANT
摘要 PROBLEM TO BE SOLVED: To surely execute the speed up operation and the partial load operation of a gas turbine and to find the optimum timing to switch the pilot operation to the pre-mixing operation. SOLUTION: The fuel 6 is injected into a combustor 5 through a number of pilot burners 10 and premixing burners 11, the combustor 5 is operated by the pilot-operation at starting and in a lower load area, the operation of the combustor 5 is switched from the pilot-operation to the premixing operation at a specific time, here, the changeover is determined on the basis of a variable changeover temperature TSWO, and the changeover temperature TSWO is determined on the basis of the pulsation generated on the flanges of the combustor 5.
申请公布号 JP2003027963(A) 申请公布日期 2003.01.29
申请号 JP20020183583 申请日期 2002.06.24
申请人 ALSTOM (SWITZERLAND) LTD 发明人 STALDER MARCEL;KNOEPFEL HANS PETER;KUEENZI THOMAS;REBHAN DIETER
分类号 F02C9/34;F02C7/228;F02C7/26;F02C9/28;F23R3/30;F23R3/34;(IPC1-7):F02C9/34 主分类号 F02C9/34
代理机构 代理人
主权项
地址