发明名称 COUPLING STRUCTURE FOR STEEL SEGMENT WITH PRE-FILLED CONCRETE
摘要 PROBLEM TO BE SOLVED: To contribute to laborsaving construction and the simplification of a structure by reducing or dispensing with bolt fastening work and work for filling in a hole of a bolt box, in terms of a steel segment with pre-filled concrete. SOLUTION: The steel segment 10 is constituted in such a manner that the pre-filled concrete is infilled into a steel shell 10a which is composed of an outer main beam 11, an inner main beam 11a, joint plate 13 and a skin plate 14; and a male joint 17a is equipped with an engaging protrusion 20 which is composed of a shank 20a, whose base end if fixed to a joining plate 18, and a head part 20b. A female joint 17 has an engaging hole 19 which is composed of an opening 19a into which the head part 20b of the male joint 17a can be inserted, and a locking part 19b into which the shank 20a can be fitted. Tapers 21a and 21c, whose diameters are reduced in one circumferential direction of the tunnel, and tapers 21b and 21d, whose diameters are reduced to the side of the base end of the shank 20a in the axial direction of the tunnel, are provided in the shank 20a and the locking part 19b, in which the rear part of the engaging hole 19 is made to serve as a closed space 23. COPYRIGHT: (C)2004,JPO
申请公布号 JP2003343196(A) 申请公布日期 2003.12.03
申请号 JP20020207764 申请日期 2002.07.17
申请人 NIPPON STEEL CORP;TECHNOS KK 发明人 TOYOSHIMA KEI;HIROZAWA NORIYUKI;MIYAKE MASATO;INADA MINORU;MIYASHITA YOSHITAKA;OKAMOTO AKIRA
分类号 E21D11/04;(IPC1-7):E21D11/04 主分类号 E21D11/04
代理机构 代理人
主权项
地址