摘要 |
A method and system for laying and burying pipe a seabed using a pipe trenching plow that is advanced along the seabed to form a continuous trench. The pipe trenching plow cuts a pilot hole in the seabed using a cutting apparatus and widens and forms a trench from the pilot hole using expandable spreading side sections. A pipe guiding sled also is used to support and guide the pipe into the trench and a trench box section retains the trench geometry as the pipe trenching plow is continuously advanced in a forward direction. The pipe trenching plow cutting the trench and burying the pipe with minimal turbidity and seabed disturbance.
|