摘要 |
FIELD: mining industry. ^ SUBSTANCE: method includes partial filling of extracted space of side and central mains by filling stripes from lava extracting shafts. At center of semi-lava on the side of massive, wherein next extractive column will be cut, filling shaft is additionally driven, wherefrom full filling of space between central fill stripe and fill stripe on the side of massive is performed. Preparation of next extraction column is performed under protection of erected fill stripes. ^ EFFECT: higher safety, higher efficiency. ^ 1 dwg
|