发明名称 METHOD FOR CONTROLLING HARD-DESTRUCTIBLE CEILING
摘要 FIELD: mining industry. ^ SUBSTANCE: method includes partial filling of extracted space of side and central mains by filling stripes from lava extracting shafts. At center of semi-lava on the side of massive, wherein next extractive column will be cut, filling shaft is additionally driven, wherefrom full filling of space between central fill stripe and fill stripe on the side of massive is performed. Preparation of next extraction column is performed under protection of erected fill stripes. ^ EFFECT: higher safety, higher efficiency. ^ 1 dwg
申请公布号 RU2246618(C1) 申请公布日期 2005.02.20
申请号 RU20030135720 申请日期 2003.12.08
申请人 发明人 SIRENKO JU.G.;KOVAL'SKIJ E.R.;GOLOVATYJ IVAN IVANOVICH;KOVALEV O.V.;ZATSEPIN M.A.;PLESKUNOV I.V.
分类号 E21C41/16;E21F15/00 主分类号 E21C41/16
代理机构 代理人
主权项
地址