摘要 |
<p>The weather seal joint (1) for prefabricated construction units is anchored to the bottom construction block by the pad (6) and double stop (7) pressed into the thin plates (17) in the rail guide (2). The waterproof foil (3) and the air stop foil (4) are fixed onto the upper block (22) by the lips (11) and the foil (5) is fixed to the lower construction block. In a horizontal joint the block (22) has two channels (18, 19), a vertical joint only has the channel (19) while modification of the foil (3) allows the profile to take a cover panel (10) or a rail guide.</p> |