摘要 |
<p>PURPOSE:To drastically reduce the probability of recommencing an allocation work and to drastically improve the work efficiency of the allocation work on the whole by providing an allocated period calculation means which calculates the required period allocated by a work allocating means and the allocated period up to the present including the required term of each work allocated till the previous time. CONSTITUTION:When each required time of each work, each prerequisite, each constraint condition, etc., are input from a condition input part 1, the allocatable period of each work at the present time is calculated by an allocatable period calculation means 2. The period ratio that each calculated allocatable period is divided by the required period of the corresponding work is then calculated on each work by the calculation means 3. The work corresponding to the smallest period ratio among each period ratios is selected by a selection means 4 and the required period of this selected work is allocated to an allocatable period by a work allocation means 5. This allocated required period and the allocated period up to the present including the required period of each work allocated till the previous time are calculated by a calculation means 6.</p> |