摘要 |
CPU 210 of an air conditioner 1 checks whether a second frost forming condition is satisfied or not. Specifically, CPU 210 reads out a heat exchanger outlet temperature Teo stored in time series into a memory part 220 to check whether the current heat exchanger outlet temperature Teo is a second threshold temperature or lower or not, whether the drop rate of the heat exchanger outlet temperature calculated using the latest heat exchanger outlet temperature Teo and the second-to-the-latest heat exchanger outlet temperature Teo is a specific drop rate or higher or not, and whether the number of indoor units in operation of indoor units 5a ˆ¼ 5c has increased or not during calculation of the drop rate of the heat exchanger outlet temperature. And, when the second frost forming condition is satisfied, CPU 210 switches a four-way valve 22 to set a refrigerant circuit 10 into a cooling cycle to thereby execute a defrosting operation preparation processing and, on completing the defrosting operation preparation processing, resumes a compressor 21 to start a defrosting operation. The thus-structured air conditioner 1 can check with no error whether frost formation has progressed suddenly in an outdoor heat exchanger or not. |