发明名称 Method and device for distributing electricity flows and electrical system comprising such a device
摘要 A method for distributing, during a given time period, electricity flows in a system having at least one production and one consumption element, and provides for measuring the state of charge of each storage element and electrical powers produced and consumed. Initialization steps include defining physical modeling parameters, defining a model, in the form of state representation using the physical parameters, defining optimization parameters, and predefining an optimization problem, over the given time period, for the distribution of the electricity flows using the model. Iterative steps, at successive updating times of the given time period, include measuring a state of charge of each storage element and the electricity production and consumption powers, updating a preview of the behavior of the production and consumption elements for another given time period, defining the formulation of the optimization problem for the other time period, solving the problem, and applying electricity distribution controls.
申请公布号 US9594364(B2) 申请公布日期 2017.03.14
申请号 US201313941007 申请日期 2013.07.12
申请人 SCHNEIDER ELECTRIC INDUSTRIES SAS 发明人 Guyon Caroline;Beguery Patrick;Lamoudi Mohamed Yacine
分类号 G05B11/01;G05B19/02;B60L11/18;H02J3/38 主分类号 G05B11/01
代理机构 Oblon, McClelland, Maier & Neustadt, L.L.P. 代理人 Oblon, McClelland, Maier & Neustadt, L.L.P.
主权项 1. A method for distributing, during a given time period, electricity flows in a system, the system including: at least one energy production element and one energy consumption element of electricity from the following elements: an electricity distribution network suitable for supplying and/or receiving energy from other elements of the system,an electricity storage element suitable for receiving energy production from the at least one energy production element of the system and/or for supplying energy to the at least one energy consumption element of the system,a building suitable for consuming energy produced locally and/or from the distribution network and/or from a storage element, anda local electricity production source suitable for supplying energy to the distribution network and/or building and/or storage element; and a monitoring unit configured to measure a state of charge of each storage element and electrical powers produced and consumed by each of the elements of the system, wherein the method comprises: initialisation steps including: a) defining physical system modelling parameters, wherein the physical system modelling parameters are physical quantities conditioning the energy consumption or production of the at least one energy production element and one energy consumption element, b) defining a model of the system, in the form of state representation using the physical system modelling parameters determined in step a), wherein the model of the system is defined with the following state representation: {xk+1=Axk+Buk+Gwkyk=Cxk+Duk+Fwkwhere xk and xk+1 are the states x of the system at times k and k+1, yk is an output parameter y of the system at the time k, uk is a control parameter at the time k, wk is a disturbance parameter w at the time k and A, B, G, C, D, F are constant matrices, c) defining optimisation parameters for solving an optimisation problem, and d) predefining the optimisation problem, over the given time period, for the distribution of the electricity flows of the system using the model defined in step b), wherein predefining the optimisation problem includes modelling a behaviour of the system for the given time period using the following equation: {tilde over (Y)}=φx0+ψŨ+ξ{tilde over (w)}where x0 is an initial state of the system, {tilde over (Y)}, Ũ and ŵ are power, control and disturbance parameters of the system respectively, for the given time period, expressed in matrix form, and Φ, ψ and ξ are constant matrices wherein the elements are dependent on the constant matrices A, B, G, C, D and F; and iterative steps at successive updating times of the given time period, including: e) measuring a state of charge of each electricity storage element, and electrical powers produced and consumed by each of the various elements of the system, f) updating a preview of the behaviour of the production and consumption elements of the system for another time period of a same duration as a duration of the given time period and starting at a considered updating time, g) defining a formulation of the optimisation problem for the another time period, wherein formulating the optimisation problem comprises at least a definition of an objective function f(Ũ) and updating of optimisation problem constraints, these constraints being expressed in the form of the following inequality: AinŨ≦bin where Ũ is the control parameter for the given time period, Ain a matrix dependent on the matrix ψ, and bin a matrix dependent on the matrices ψ and ξ, on minimum {tilde over (Y)}min and maximum values {tilde over (Y)}max of the output parameter {tilde over (Y)}, and on a maximum variation δŨmax of the control Ũ, h) solving the optimisation problem in step g) by using a solver to generate a solution, and i) applying electricity distribution controls in the system using the solution from step h), until a next iteration of the successive updating times of the given time period.
地址 Rueil-Malmaison FR