发明名称 Fitting confirmation construction for connectors
摘要 In a fitting confirmation construction, a lock arm is provided in a housing of a first connector. The lock arm includes a lock wall inclined and disposed at a front end of the lock arm in a direction from the first connector toward the second connector; a deflection space formed at a rear of the lock wall in the direction; and an operation plate disposed on the deflection space. A confirmation opening is provided in a rear wall of the housing, and has a height equal to a height of the deflection space. A lock projection is provided on a second connector to be brought into engagement with the lock wall. A rear end face of the operation plate is exposed to a rear outside of the housing of the first connector through the confirmation opening, only in a state where the lock arm is deflected.
申请公布号 US9640886(B2) 申请公布日期 2017.05.02
申请号 US201213604017 申请日期 2012.09.05
申请人 YAZAKI CORPORATION 发明人 Ohyama Kouichi
分类号 H01R12/79;H01R13/627;H01R13/641 主分类号 H01R12/79
代理机构 Sughrue Mion, PLLC 代理人 Sughrue Mion, PLLC
主权项 1. A fitting confirmation construction for confirming a connection between a first connector and a second connector, the fitting confirmation construction comprising: a lock arm, provided in a housing of the first connector, and including: a lock wall inclined and disposed at a front end of the lock arm in a direction from the first connector toward the second connector; a deflection space formed at a rear of the lock wall in the direction; and an operation plate disposed on the deflection space; a confirmation opening, provided in a rear wall of the housing, and having a height equal to a height of the deflection space; and a lock projection, provided on the second connector, and configured to be brought into engagement with the lock wall, wherein a rear end face of the operation plate is exposed to a rear outside of the housing of the first connector through the confirmation opening, only in a first state where the lock arm is deflected, and a lower end face of the operation plate is positioned on a same plane as an upper end of the confirmation opening, in a second state where the lock arm is un-deflected.
地址 Tokyo JP