发明名称 Systems and methods for minimizing energy costs for a power consumption system that has access to off-grid resources
摘要 A method includes: calculating a load prediction arising from an power consumption entity over a prospective time period; calculating a predicted off-grid power supply from an off-grid power supply; minimizing, for a respective time interval, a calculated amount of electrical-power to import from a power grid, in accordance with output from a cost function; and, for at least one interval, importing, from the power grid, the corresponding calculated amount of electrical-power corresponding to the at least one interval. The cost function uses: (i) a multi-component time of use tariff schedule associated with the power grid that includes a first power rate during a prospective time period and second power rate during a second time period, (ii) the load prediction over the prospective time period, (iii) the predicted off-grid electrical-power supply over the prospective time period, (iv) a state of a rechargeable battery.
申请公布号 US9639904(B2) 申请公布日期 2017.05.02
申请号 US201313836253 申请日期 2013.03.15
申请人 OPTERRA ENERGY SERVICES, INC. 发明人 Idrees Osama Mohammed;Potter David Sterling;Alegria Eduardo Alberto
分类号 G06Q50/06;H02J3/00;H02J3/32;H02J3/38 主分类号 G06Q50/06
代理机构 Bryan Cave LLP 代理人 Bryan Cave LLP
主权项 1. A method, comprising: at a computer system having one or more processors and memory storing one or more programs executed by the one or more processors: calculating a load prediction arising from an electrical-power consumption entity over a prospective time period;calculating a predicted off-grid electrical-power supply from an off-grid electrical-power supply over the prospective time period;minimizing, for a respective time interval in a plurality of time intervals, a calculated amount of electrical-power to import from a power grid during the respective time interval, in accordance with output from a cost function, wherein the cost function uses: (i) a multi-component time of use tariff schedule associated with the power grid that includes a first power rate during a prospective time period and second power rate during a second time period, wherein the first power rate is other than the second power rate,(ii) the load prediction over the prospective time period,(iii) the predicted off-grid electrical-power supply over the prospective time period, and(iv) a state of a rechargeable battery, wherein the plurality of time intervals collectively accounts for the prospective time period; andfor at least one interval in the plurality of time intervals, importing, from the power grid, the corresponding calculated amount of electrical-power corresponding to the at least one interval.
地址 Overland Park KS US