发明名称 Downhole health monitoring system and method
摘要 A method of installing multi-trip completions in a borehole. The method includes interfacing a health monitoring system with a first section of the multi-trip completions, the health monitoring system configured to engage with at least one of a first control line and first equipment of the first section. Running the health monitoring system and the first section downhole to a selected position within the borehole; storing information about a health of the at least one of the first control line and first equipment of the first section within the health monitoring system. Removing the health monitoring system from the borehole while leaving the first section within the borehole; accessing the information from the health monitoring system; and, determining, based on the information, whether or not to run a second section having a second control line into the borehole. The second control line configured to connect with the first control line.
申请公布号 US9624763(B2) 申请公布日期 2017.04.18
申请号 US201414499494 申请日期 2014.09.29
申请人 BAKER HUGHES INCORPORATED 发明人 Samuelson Marc N.;Bayne Christian F.;Bishop David S.
分类号 E21B47/01;E21B47/00;E21B47/12;E21B17/02 主分类号 E21B47/01
代理机构 Cantor Colburn LLP 代理人 Cantor Colburn LLP
主权项 1. A method of installing multi-trip completions in a borehole, the method comprising: interfacing a health monitoring system with a first section of the multi-trip completions, the health monitoring system configured to engage with a equipment including a first control line and a device of the first section; running the health monitoring system and the first section into the borehole in a downhole direction to a selected position within the borehole; storing information about a health of at least one of the first control line and the device of the first section within the health monitoring system; removing the health monitoring system from the borehole while leaving the first section within the borehole; accessing the information from the health monitoring system; and, determining, based on the information, whether or not to run a second section having a second control line into the borehole, the second control line configured to connect with the first control line.
地址 Houston TX US