发明名称 Testing a control unit by means of a test environment
摘要 An arrangement for testing a control unit via a test environment, having a computer-based test management tool, wherein the test management tool is configured for model-based development and/or management of at least one test plan implemented as a data structure in order to test the control unit, and the test plan has at least one test and a start condition for initiating execution of the test plan; a computer-based test execution control tool, wherein the test execution control tool is configured to initiate execution of the test plan on the test environment when the start condition is met; and a computer-based database, wherein the database is configured to store the test plan implemented as a data structure and is also configured for shared, common access to the test plan by the test management tool and the test execution control tool.
申请公布号 US9626263(B2) 申请公布日期 2017.04.18
申请号 US201414525764 申请日期 2014.10.28
申请人 dSPACE digital signal processing and control engineering GmbH 发明人 Senf Matthias
分类号 G06F11/00;G06F11/26;G06F11/36;G05B23/02 主分类号 G06F11/00
代理机构 Muncy, Geissler, Olds & Lowe, P.C. 代理人 Muncy, Geissler, Olds & Lowe, P.C.
主权项 1. A system arrangement for testing a control unit via a test environment, the arrangement comprising: a test management device configured for model-based development and management of at least one test plan implemented as a data structure in order to test the control unit, each test plan having at least one test and a start condition for initiating execution of the test plan; a test execution control device operating the test environment, wherein the test execution control device initiates execution of the at least one test plan on the test environment if the start condition is met; and a database device configured to store the data structure of the at least one test plan and connected, for shared, common, simultaneous, real-time access to the test plan, to the test management device and the test execution control device, wherein the test management device, the test execution control device, and the database device are separate and connected to each other, wherein the test management device and the test execution control device each have direct access to the database device, the test management device providing the test plan to the database device based on the control unit under test.
地址 Paderborn DE