发明名称 WATER STORAGE TANK STRUCTURE AND OPERATING METHOD FOR THE REVERSE OSMOSIS WATER PURIFYING SYSTEM
摘要 A water storage tank built for a reverse osmosis water purifying system deploys multi water flow passages of purified water and drainage water, allocated a soft bladder unit receiving purified water encompassed by the waste water in the tank. When the water tank unit is fully filled with water, the water pressure activates the auto-shut-off valve or solenoid valve to stop operation of the reverse osmosis water purifying system. When the dispensing faucet is turned on, the drainage water swells to squeeze the soft bladder unit to deliver the purified water out from the soft bladder unit to the dispensing faucet, and the drainage water flushes the reverse osmosis membrane as well. The technique enables the tank to take the least water pressure resistance to hold water and drain water which results in energy saving and water saving.
申请公布号 US2017073942(A1) 申请公布日期 2017.03.16
申请号 US201615013134 申请日期 2016.02.02
申请人 MAXTEC PLASTICS, INC. 发明人 LEE SHIH PING
分类号 E03B11/02;E03B3/00;C02F1/00;B01D61/08;C02F1/44;E03B1/04;B01D61/02 主分类号 E03B11/02
代理机构 代理人
主权项 1. A water tank unit “A” comprising: a tank 1 having a room 11 defined therein, multiple holes 111, 111a, 111b defined through a top of the tank 1, the tank 1 having an open bottom 12 to which a bottom cover 13 is connected; a control valve 2 connected to the top of the tank 1 and having multiple water passages a-c, the water passages a-c being connected with the holes 111, 111a, 111b in the top of the tank 1 respectively, and a soft bladder unit 3 located in the room 11 of the tank 1 and having a bladder 31 with an axial support shaft 32 connected therein, the axial support shaft 32 having a connection path 33 connected to a top thereof, the connection path 33 connected with one of the water paths a-c, the control valve 2 controls drainage water to enter into and to flow out from the room 11 of the tank 1, when the drainage water enters into the room 11, the drainage water squeezes purified water in the soft bladder unit 3 to be flown out from the tank 1.
地址 Taichung City TW