发明名称 Commissioning field devices in a process control system supported by big data
摘要 Techniques for determining device-specific information such as commissioning data, location information, images, and other data descriptive of a process device installed in a plant include obtaining the device-specific information at a local device during the process device's commissioning. Based on this information, the local device determines the relative order of the process device within a process flow, and may determine a process element alignment map indicating the activation order of a plurality of process elements within the flow. A user may modify the map at the local device. The map is transmitted to a process control big data network for use in discovery and learning analytics. The device-specific information and/or the map may be utilized to generate, at the local device, representations/views of the process flow, which may include real-time operational data. A user may zoom in or out on these views for more or less detail.
申请公布号 US9588514(B2) 申请公布日期 2017.03.07
申请号 US201514605304 申请日期 2015.01.26
申请人 FISHER-ROSEMOUNT SYSTEMS, INC. 发明人 Christensen Daniel Dean;Beoughter Ken J.;Blevins Terrence L.;Nixon Mark J.;Muston Paul R.;Wojsznis Wilhelm K.
分类号 H01L21/00;G05B19/418 主分类号 H01L21/00
代理机构 Marshall, Gerstein & Borun LLP 代理人 Marshall, Gerstein & Borun LLP
主权项 1. A method of determining process element alignment in a process, the method comprising: obtaining, at a local device operated by a user during commissioning of a field device installed in a process plant, identification information of the field device; determining, by the local device based on a physical location at which the field device is installed, a relative process order of the field device with respect to another process device to be used to control the process in the process plant; and providing, by the local device, the identification information and an indication of the relative process order of the field device for use in generating a process element alignment map of the process, the process alignment map of the process indicating an order of activation of each of a plurality of process elements in a flow of materials within the process plant while the process is being controlled, the plurality of process elements including the field device and the another process device.
地址 Round Rock TX US